Lead Project Controls for the $1.0 Billion Megaspine project at Changi Airport T5, establishing robust baselines using an innovative 4D and 5D BIM framework.
Directed Delay Analysis and the preparation of Extension of Time (EOT) claims for the Civil Division’s international business unit.
Managed the QS Team for the Pulau Tekong Polder project ($1.2B), overseeing the identification and evaluation of over 35 complex claims.
Standardized Digital Transformation by developing procedures and software evaluations to transition the company to a full BIM 5D system.This is a Paragraph Font
Spearheaded Planning for the Patimban Port Development (US $430M), linking WBS to Cost Management Structures in a JV environment.
Reduced LD Exposure by 80% on the Changi Ground Improvement project ($1.2B) by restructuring the baseline for 64 complex project phases.
Standardized Reporting and data collection flows between departments to improve project transparency and monitoring.
Coordinated Subcontractors for the $70M Baggage Handling System at Changi T4, managing the installation of 10km of conveyors and 1,200 tons of steel.
Oversaw Global Logistics for over 100 shipping containers from five international suppliers under a tight automated terminal schedule.
Served as Planning Manager cum Design Coordinator in Evonik Methionine Plant ($25M) -world's largest methionine plant. Managed complex stakeholders and the installation of specialized structural systems (RC and Steel).
Served as Planning Manager cum QAQC Manager and developed a specific coordination system for pre-casting pipe racks and led the QAQC department to meet high petrochemical standards.
Megaspine (Changi T5 Development)
Construction of approximately 3 km of Cut-and-Cover tunnels connecting the upcoming Changi Airport Terminal 5 (T5) with its satellite facilities, serving as a vital backbone for MRT service extension.
ROLE: Senior Manager, Project Controls
Key Achievements:
Established and maintained a robust project baseline through an integrated 4D and 5D BIM framework.
Managed extensive Earth Retaining and Stabilizing Systems (ERSS) and excavation of over 3 million cubic meters.
Oversaw the installation of more than 3,000 bored piles to support the reinforced concrete structures.
Construction of Polder at Pulau Tekong
The first polder construction in Singapore, adding 810 ha of new land via a 10km-long dike, earthworks, and a vast network of water pumping systems.
ROLE: Senior Manager, Project Controls
Key Achievements:
Developed an overall Extension of Time (EOT) Claim incorporating 30 Instructions and 35 Claims, accounting for a 3-year delay.
Managed the QS team in identifying and evaluating updated claims while ensuring full compliance with Contract conditions.
Megaspine (Changi T5 Development)
Construction of approximately 3 km of Cut-and-Cover tunnels connecting the upcoming Changi Airport Terminal 5 (T5) with its satellite facilities, serving as a vital backbone for MRT service extension.
ROLE: Senior Manager, Project Controls
Key Achievements:
Established and maintained a robust project baseline through an integrated 4D and 5D BIM framework.
Managed extensive Earth Retaining and Stabilizing Systems (ERSS) and excavation of over 3 million cubic meters.
Oversaw the installation of more than 3,000 bored piles to support the reinforced concrete structures.
Construction of Polder at Pulau Tekong
The first polder construction in Singapore, adding 810 ha of new land via a 10km-long dike, earthworks, and a vast network of water pumping systems.
ROLE: Senior Manager, Project Controls
Key Achievements:
Developed an overall Extension of Time (EOT) Claim incorporating 30 Instructions and 35 Claims, accounting for a 3-year delay.
Managed the QS team in identifying and evaluating updated claims while ensuring full compliance with Contract conditions.
Megaspine (Changi T5 Development)
Construction of approximately 3 km of Cut-and-Cover tunnels connecting the upcoming Changi Airport Terminal 5 (T5) with its satellite facilities, serving as a vital backbone for MRT service extension.
ROLE: Senior Manager, Project Controls
Key Achievements:
Established and maintained a robust project baseline through an integrated 4D and 5D BIM framework.
Managed extensive Earth Retaining and Stabilizing Systems (ERSS) and excavation of over 3 million cubic meters.
Oversaw the installation of more than 3,000 bored piles to support the reinforced concrete structures.
Construction of Polder at Pulau Tekong
The first polder construction in Singapore, adding 810 ha of new land via a 10km-long dike, earthworks, and a vast network of water pumping systems.
ROLE: Senior Manager, Project Controls
Key Achievements:
Developed an overall Extension of Time (EOT) Claim incorporating 30 Instructions and 35 Claims, accounting for a 3-year delay.
Managed the QS team in identifying and evaluating updated claims while ensuring full compliance with Contract conditions.
T211 Sin Ming Station and Associated Tunnels
Part of the Thomson-East Coast Line (TEL), involving the Slurry Shield Method construction of four bored tunnels (approx. 3.8 km total) and a station building.
ROLE: Senior Manager, Project Controls
Key Achievements:
Secured a favorable Extension of Time (EOT) for a 9-month delay caused by client instructions and the COVID-19 pandemic.
Successfully negated the payment of Liquidated Damages (LDs) through detailed claim evaluation and submission.
Patimban Port Development – Project (I) – Package 1
JICA-funded development comprising dredging, reclamation, and ground improvement of 52 Ha, plus the construction of berthing and port facilities.
ROLE: Planning Manager
Key Achievements:
Developed the Project Baseline and linked the Work Breakdown Structure (WBS) to the Cost Management Structure (CMS).
Established internal and external project reporting systems and vetted independent EOT claims prior to submission.
T211 Sin Ming Station and Associated Tunnels
Part of the Thomson-East Coast Line (TEL), involving the Slurry Shield Method construction of four bored tunnels (approx. 3.8 km total) and a station building.
ROLE: Senior Manager, Project Controls
Key Achievements:
Secured a favorable Extension of Time (EOT) for a 9-month delay caused by client instructions and the COVID-19 pandemic.
Successfully negated the payment of Liquidated Damages (LDs) through detailed claim evaluation and submission.
Patimban Port Development – Project (I) – Package 1
JICA-funded development comprising dredging, reclamation, and ground improvement of 52 Ha, plus the construction of berthing and port facilities.
ROLE: Planning Manager
Key Achievements:
Developed the Project Baseline and linked the Work Breakdown Structure (WBS) to the Cost Management Structure (CMS).
Established internal and external project reporting systems and vetted independent EOT claims prior to submission.
Ground Improvement Works for Future Airport Development
Large-scale site preparation for Changi Terminal 5 covering 1,080 Ha, including the diversion of 6 km of coastal roads and 200 km of cable installation.
ROLE: Senior Manager, Project Controls
Key Achievements:
Reduced original exposure to Liquidated Damages (LDs) by over 80% through strategic EOT claim submissions.
Standardized Planning Department reports and data collection systems across 64 independent project phases.
Managed final settlement of accounts and cost claims with the Ministry of Transportation.
ME-5 CSA3 Methionine Plant (Evonik)
The world's largest methionine plant at completion, featuring RC and steel structural systems for electrical and process buildings.
ROLE: Planning Manager cum Design Coordinator
Key Achievements:
Managed demanding design coordination for specialized systems and numerous stakeholders.
Developed the Baseline programme and reporting systems while overseeing complex structural and fireproofing installations.
Jurong Aromatics Complex (ISBL)
Large-scale site preparation for Changi Terminal 5 covering 1,080 Ha, including the diversion of 6 km of coastal roads and 200 km of cable installation.
ROLE: Senior Manager, Project Controls
Key Achievements:
Reduced original exposure to Liquidated Damages (LDs) by over 80% through strategic EOT claim submissions.
Standardized Planning Department reports and data collection systems across 64 independent project phases.
Managed final settlement of accounts and cost claims with the Ministry of Transportation.
Advance Management System Consultancy, Singapore